Carter Machinery HR Offices & Oil Lab
-
Salem, VA
This construction project consisted of demoing the existing Human Resource and Purchasing offices. The renovation included the addition of 10 Human Resource offices, a conference room, and a lobby. The new Oil Lab Testing Facility consisted of 28 lab testing tables, 8 ceiling service panels, a 25-ton rooftop HVAC unit with energy recovery systems, Lochinvar Boiler, air monitoring systems, oil syphoning systems, and 4 lab exhaust snorkels with High Plume Laboratory exhaust fans.
![A display of machinery outside of the Carter Machinery Oil Lab in Salem, Virginia.](https://www.lionberger.com/wp-content/uploads/2023/03/Project-Description-Photo-1-807x1048-c-default.webp)
project manager
Timmy Miller
architect
Balzer & Associates
construction type
Metal studs, CMU
square-footage
5,800
![Equipment inside the oil lab addition of Carter Machinery in Salem, Virginia.](https://www.lionberger.com/wp-content/uploads/2023/03/9-scaled-1600x0-c-default.webp)
![Equipment inside the oil lab addition of Carter Machinery in Salem, Virginia.](https://www.lionberger.com/wp-content/uploads/2023/03/7-800x0-c-default.webp)
![Equipment inside the oil lab addition of Carter Machinery in Salem, Virginia.](https://www.lionberger.com/wp-content/uploads/2023/03/6-800x0-c-default.webp)
![Equipment inside the oil lab addition of Carter Machinery in Salem, Virginia.](https://www.lionberger.com/wp-content/uploads/2023/03/8-533.33333333333x0-c-default.webp)
![Equipment inside the oil lab addition of Carter Machinery in Salem, Virginia.](https://www.lionberger.com/wp-content/uploads/2023/03/10-533.33333333333x0-c-default.webp)
![The Caterpillar Diesel machine located outside of the Carter Machinery building in Salem, Virginia.](https://www.lionberger.com/wp-content/uploads/2023/03/14-533.33333333333x0-c-default.webp)